Project Name Clients Values

(In Crores)

Region Status / Completion Period
Design & Construction of bridge between Madha and Versova in K/W and P/N wards. BMC,Mumbai 2,029.80 Maharashtra 36 Months
Design and Construction of Tertiary Treated Water Conveyance Tunnel from Ghatkopar WwTF to Bhandup WwTF and further upto Bhandup Complex Package I BMC,Mumbai 3213 Maharashtra 93 Months
Replacement of 2750 mm dia. Tansa Enlarged main in Gundavali – Kasheli – Balkum section and Replacement of 2400 mm dia. Vaitarna main in the Gundavali – Kapurbawadi – MCP – Saddle Tunnel section by providing and laying 3000 mm dia MS Pipeline BMC,Mumbai 992.32 Maharashtra 24 Months
Construction of secondary access road (0.75 Km) for emergencies and VIP’s exit for Noida International Airport, YElIDA & Construction of 30m wide peripheral road from point H-E-D1-C, (8.00 Km) along Northern and Eastern side boundary wall of Airport on item rate (percentage) basis” NHAI 239.84 Uttar Pradesh 24 Months
Design and construction of Tunnel from Yewai Master Balancing Reservoir to Kasheli Tal. Bhiwandi Dist. Thane. BMC,Mumbai 4315.89 Maharashtra 73 Months
Widening & strengthening work of Chandauli-Sakaldiha-Saidpur Road (On SH No.69) into four lane at District Chandauli in the state of Uttar Pradesh from UP, PWD. UPPWD 292.52 Uttar Pradesh 18 Months
Widening & strengthening work of Mohansarai Upadhyay Nagar Chakia Road (On SH No.120) into four/six lane at District Chandauli in the state of Uttar Pradesh from UP, PWD. UPPWD 205.03 Uttar Pradesh 18 Months
Development of Four/Six-lane Access Control Expressway from Design Chainage Km515.00 to Km 528.300(Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km 550.900 to Km 566.520 (domel to Katra Section) on Hybrid Annuity Mode under bharatmala Pariyojna in the UT of J&K (Phase II-Package XVII) NHAI 1547.91 Jammu & Kashmir 24 Months
Construction of Greenfield Connectivity to Jewar International Airport from DND – Faridabad – Ballabhagh Bypass KMP Link – Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Uttar Pradesh & Haryana NHAI 1660.5 U.P. & Haryana 24 Months
Development of 6Lane AC Highway from Ranipur Barsi Saharanpur Distt. to Adhoya Musalmana Ambala Dist. Shamli Ambala Sec of Bareilly Ludhiana EC on EPC under Bharatmala Pariyojana Ph-1 in Haryana (Pkg‐2) NHAI 859.62 Haryana 24 Months
Development of Four Laning of Munger to Mirzachauki (NH-80) section from Kharia village junction to start of existing Bhagalpur bypass (Design Chainage Km95+580 to Km125+000) (Package 02) on Hybrid Annuity mode in the state of Bihar. NHAI 902 Bihar 24 Months
Construction of Six Laning of Naidupeta Junction – Turpukanupur Section from Km 57+046 to Km 91+927 in the state of Andhra Pradesh on HAM under Bharatmala Pariyojna Phase-I. NHAI 961.2 Andhra Pradesh 24 Months
Construction of two no. of ROBs on Dr. E.Moses Road and Keshavrao Khade Marg near Mahalaxmi Railway Station in G/South Ward. Bid No. 71000159652. Municipal Corporation of Greater Mumbai 603.61 Maharashtra 36 Months
Development of Bundelkhand Expressway Project (Package-II): From Mahokhar (Dist. Banda) to Kaohari (Dist. Mahoba) (Km 49+700 to Km 100+000) in the state of Uttar Pradesh on EPC Basis. UPEIDA 1774.09 Uttar Pradesh 36 Months
Construction of 4-lane Bangalore-chennai Expressway from KM 96.000 (Baireddypalle) to Km 127.000 (Bangarupalem) Section in the State of Andhra Pradesh under Bharatmala on Hybrid Annuity Mode (Phase II/Package II) NHAI 2007 Andhra Pradesh 24 Months
Development of Four Laning of Munger to Mirzachauki (NH-80) section from Rasulpur to Mirzachauki Design Chainage Km. 157+350 to Km. 193+931 (Package 04) on Hybrid Annuity mode in the state of Bihar. NHAI 892 Bihar 24 Months
Construction of Eight Lane access controlled Expressway from Km 3.00 to Km 20.200(Shirsad to Akloli section – Spur of Vadodara Mumbai Expressway Project) in the state of Maharashtra on EPC Mode under Bharatmala Pariyojna. IRCON 1246.97 Maharashtra 18 Months
Upgrading/improvement of Ch.0+000+367 Sector of Bhedetar-Rabi-Ranke Road ;Contract no. RiDP/337133/BRR-01/074/75. MoPIT, Govt of Nepal 32618541.12 Kathmandu,Nepal 36 Months
Construction of Uni Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EC Mode (Pkg -III) NHIDCL 431.28 J&K 24 Months
Construction of tunnel T-8 (between Km 22+342 to Km 26+508 approx.) with a central evacuation tunnel approx. 1094 m long on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project. Ircon International Limited 422.38 Bihar 30 Months
The Versova Bandra Sea Link Project (VBSLP) : VBSLP comprises construction of a sea link bridge along the West coast of Mumbai from Bandra (on South side) at Bandra-Worli Sea Link (BWSL) to Versova at Nana Nani Park (on North side) with intermediate connectors at Juhu Koliwada and Otter’s Club and tolling facilities. MSRDCL 7000 Maharashtra 60 Months
Review of Survey, Design,drawings,DPR and Construction of Mathura Package-1 Multi Group of Villages Water Supply Schemes, District-Mathura(Surface Water) with relevant works including Commissioning and Operation & Maintenance for 10 years in the State of Uttar Pradesh) State Water and Sanitation Mission (SWSM), Uttar Pradesh 1919.21 Uttar Pradesh 18 Months
Review of Survey, Design,drawings,DPR and Construction of Mathura Package-2 Multi Group of Villages Water Supply Schemes, District-Mathura(Surface Water) with relevant works including Commissioning and Operation & Maintenance for 10 years in the State of Uttar Pradesh) State Water and Sanitation Mission (SWSM), Uttar Pradesh 960.08 Uttar Pradesh 18 Months
Construction of Acces Controlled Expressway Connector ot Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samuddhi Mahamarg from Jalna ot Nanded ni the state of Maharashtra on EPC Mode for Package JNE-01 from Panshendra KM (-) 0+090 ot Sarwadi (Ner) KM 36+000 (Length -36.09 KM) ni Tq. & Dist. Jalna. MSRDCL 2570 Maharastra 24 Months
Construction of Acces Controlled Expressway Connector ot Hindu Hrudaysamrat
Balasaheb Thackeray Maharashtra Samruddhi Mahamarg from Jalna ot Nanded ni
hte state of Maharashtra on EPC Mode for Package JNE-02 from KM 36+000 ot
Sarwadi (Ner) to KM 66+550 Patoda Kh. Tq. Mantha (Length – 30.550 KM) ni Dist. Jalna.
MSRDCL 2375 Maharastra 24 Months
Mumbai Coastal Road North Project- Package- A(Versova interchange to Bangur Nagar) (Elevated Road) (Chainage: -0 +000 to Chainage 4+540). BMC,Mumbai 2543 Maharastra 48 Months
Mumbai Coastal Road North Project-Package ‘F’ (Gorai Interchange to Dahisar Interchange) (Elevated Road) Chainage (14 +780 to 18+470). BMC,Mumbai 3084 Maharastra 48 Months

Roads, Metro & Bridges